Media and Events> Press Releases> June 22, 2005:

 Drilling Significantly Expands Recently Discovered Lower Zones at Essakan

Intersections include 12.3 g/t over 13m and 4.1 g/t over 28m

 

Orezone Resources Inc. (OZN:TSX, AMEX) is pleased to announce that drilling on the Company's Essakan gold project in Burkina Faso, West Africa, has significantly expanded the new zones of mineralization that were recently identified in the footwall below the Essakan Main Zone ("EMZ"). Results include 12.3 g/t over 13m in hole ERC0844D, 6.7 g/t over 13m in hole ERC832D and 4.1 g/t over 28m in hole ERC1076D.

The footwall mineralization has now been intersected by more than 130 drill holes over a strike length up to 1.5km, and from surface to a depth of 200m. The mineralization generally occurs from one to 20m below the EMZ and its average thickness is in the order of 10m. The average grade of the footwall mineralization from drilling done to date is higher than the average grade of the EMZ. While this is encouraging, it may reflect the fact that most of the drilling in the footwall is below the 1km higher grade core of the EMZ. This positive correlation may be indicative of the strength of the structure that produced the higher grades within the deposit.

Orezone currently has two reverse circulation ("RC") drill rigs and two core rigs working on the EMZ. A total of 55,645m of RC and 10,529m of diamond core drilling have been completed since the current drill program commenced in August, 2004 and a further 17,000m of drilling is planned. The program includes both infill drilling on 25m by 25m centres to increase the percentage of resources in the measured and indicated categories and expansion drilling to increase the total size of the resource. The expansion drilling is targeting the down dip extension and the western margin of the EMZ, strike extensions to both the north and south, and the lower zones.

Over 20,000 samples from Essakan are currently waiting to be assayed and encouraging results are being received from approximately 7,000 new samples being generated each month. As a result, the joint ventures partners have made a decision to defer the planned resource update until such time as more of this new data can be incorporated into the calculation.

Ron Little, President of Orezone stated that "The latest drilling results continue to confirm our belief that the EMZ is significantly larger than the current indicated resource of 2.4 million ounces and inferred resource of 300,000 ounces (based on a 0.5 g/t cut off grade). These resources were calculated in August, 2004 and almost 66,000m of drilling has been completed since that time. Ongoing drilling continues to extend the limits of the mineralization in the lower zones, down dip, and along strike to both the north and south."

 

Table 1.  Summary of Recent Results from the EMZ.

(see complete table of results at www.orezone.com/emztable.asp)

HOLE-ID

Section

From

To

Length

Grade

 

 

m

m

m

g/t

EDD0010

50650N

129.0

133.0

4.0

12.39

ERB0370

49500N

36.0

41.0

5.0

3.74

ERC0079

49400N

28.0

37.0

9.0

2.39

ERC0118

50900N

47.0

77.0

30.0

0.58

ERC0804

50825N

0.0

25.0

25.0

0.56

ERC0811D

50925N

54.0

65.0

11.0

1.73

ERC0812D

50925N

58.0

70.0

12.0

3.57

ERC0829D

50725N

102.0

113.0

11.0

1.18

ERC0832D

50725N

104.0

117.0

13.0

6.72

ERC0833D

50725N

120.9

137.9

17.0

1.50

ERC0836D

50725N

118.8

130.8

12.0

1.78

ERC0840D

50825N

101.0

124.0

23.0

0.69

ERC0843D

50875N

142.5

150.0

7.5

6.09

ERC0844D

50925N

69.0

82.0

13.0

12.32

ERC0860D

50925N

173.3

194.1

20.9

0.77

ERC0861D

50875N

146.3

149.3

3.0

12.72

ERC0864D

50825N

120.9

154.6

33.8

0.38

ERC0875D

50825N

165.0

186.0

21.0

1.36

ERC0877D

50775N

156.0

184.9

29.0

3.44

ERC0878D

50725N

163.0

188.0

25.0

2.25

ERC0886D

50950N

170.0

179.0

9.0

1.58

ERC0889D

50550N

129.0

140.0

11.0

1.81

ERC0891

50500N

81.0

83.0

2.0

8.94

ERC1001

49950N

61.0

73.0

12.0

1.06

ERC1021

50300N

62.0

82.0

20.0

1.51

ERC1037

50850N

0.0

27.0

27.0

0.48

ERC1059

50900N

42.5

60.0

17.5

0.81

ERC1065D

50775N

169.9

195.9

26.0

1.85